Microsoft, fiscal 2026 (the year ended 30 Jun 2026; 10-K filed 29 Jul 2026). Microsoft is building huge data centres for AI. Figures from its FY2025 and FY2026 10-Ks on SEC EDGAR, checked 20 Nov 2026:
| FY2025 | FY2026 | |
|---|---|---|
| Capex ("Additions to property and equipment") | $64.6B | $115.9B |
| Depreciation expense | $22.0B | $34.3B |
| Net income | $101.8B | $133.7B |
| Operating cash flow | $136.2B | $182.9B |
capex growth: 115,948 ÷ 64,551 = 1.80 → up about 80%
net income growth: 133,749 ÷ 101,832 = 1.31 → up about 31%
capex vs depreciation in FY2026: 115.9 ÷ 34.3 ≈ 3.4×
Microsoft spent about 3.4 times as much on new equipment as it charged against profit for wear on existing equipment. Profit grew 31%; the building spree shows up in cash.
Subtract capex from operating cash flow to see the cash left after paying for new equipment:
FY2025: 136,162 − 64,551 = 71,611 million ≈ $71.6B
FY2026: 182,935 − 115,948 = 66,987 million ≈ $67.0B
Profit rose by about $32B, but the cash left after capex fell by about $4.6B.
And the bill for profit is still coming. Microsoft's 10-K says it depreciates servers and network equipment over two to six years and buildings over five to 15 years. So the $115.9B spent this year will show up as depreciation over many future years. Depreciation already rose from $22.0B to $34.3B in one year. If the spending continues, it will keep rising and squeeze future profit.
Two notes:
- That capex figure leaves out equipment Microsoft gets through finance leases (long rental deals that work like borrowing to buy). Microsoft's own commentary sometimes quotes capex including those, which is a bigger number. Always check which one you're reading.
- Microsoft also recorded $4.7B of amortisation of intangible assets in fiscal 2026, many of them picked up when it bought other companies.