A round illustrative portfolio of $50,000, with a 1% risk limit.
Risk limit: $50,000 × 1% = $500
A stock bought at $100, with an exit or review point at $80:
Loss per share at $80: $100 − $80 = $20 (a 20% fall)
Shares: $500 ÷ $20 = 25 shares
Position: 25 × $100 = $2,500 → 2,500 ÷ 50,000 = 5% of the portfolio
A coin with its exit or review point 40% below the buy price (bitcoin's annualised volatility, Module 2's measure, was about 47% over the three years to Nov 2026, so a 40% move is not unusual):
Position: $500 ÷ 0.40 = $1,250 → 2.5% of the portfolio
Same $500 at risk in both. The further away the point, the smaller the position: the more something wiggles, the less of it you can hold for the same risk.
The catch: the point is a plan, not a guaranteed price
The formula assumes you act at your point. Often you can't. If the stock closes at $85 and next opens at $65, a stop order sells near $65 and a review point is first reached there:
Planned loss: 25 × ($100 − $80) = $500 (1% of the portfolio)
Actual loss: 25 × ($100 − $65) = $875 (1.75%)
Real prices do this. Nvidia (Yahoo Finance, daily, price only, checked 20 Nov 2026):
- 12 Nov 2026: opened at $151.01 after closing at $173.73 the day before, a 13.1% gap (a jump with no trades in between). A stop order anywhere between those prices sold at around $151.
- 21 Oct to 19 Nov 2026: $221.97 to $145.98, down 34.2%.
So what really limits your loss is the position size, not the point. A review point limits it even less: if the review keeps the position, the fall can go on. At 5%, even a total wipe-out costs 5% of the portfolio. That's why the cap matters as much as the formula.